ECO Purer Logo

Tunnels
The following photographs show the before and after results of EcoPittura being applied to the pavement and Ecopaint painted onto a wall surface within a Tunnel. Within just one month, the results are astounding.

For more information on the two products shown on this page, please go to the products section.
Before application
  Before application
The day after the pavement application
  The day after the pavement application
One month later
  One month later
Stainless Steel Tube inside the Tunnel washed the same day of Ecopaint application, one month later
 

Stainless steel tube inside the tunnel washed the same day of Ecopaint application, one month later

Three months later
 

Three months later

 

Products applied on 23/07/2003:
present situation

Traditional paint reference white
 

Traditional paint reference white

Ecoactive Photocatalytic EcoPittura
 

Ecoactive photocatalytic EcoPittura


 

Global Engineering Logo
IQNet and CSQ Certified logos


EcoRivestimento, EcoPittura, EcoTunnel and Activa logos

This website is designed and hosted by MagicBox Internet